Upper Level Footprint

The hole for each pile is core drilled through the structure to ensure we’re drilling in the right location. The camera on an iPhone 6 is so good it can peak inside this dark hole and document what’s at the bottom without a flash. The upper level footprint is now complete. The rest of the…

Read More →

Lower Level Stucture

All the lower level structural steel has now been installed. The final third took two people six working days to install. The second level will start to go in next week.